EPC Contractor Selection Using Fuzzy AHP, TOPSIS, Partial Value Function, and Time Decay Correction Methods
DOI:
https://doi.org/10.21070/prozima.v10i1.1786Keywords:
EPC Contractors Selection, Fuzzy AHP, TOPSIS, Partial Value Function, Time Decay CorrectionAbstract
The selection of EPC contractors at PT XZ heavily relies on the lowest-bid method, which focuses on cost-effectiveness but may disregard the contractor's technical expertise, ability to implement projects, and previous track record. This study develops a model for contractor selection based on performance and objectivity by integrating some methods such as fuzzy AHP, TOPSIS, partial value function (PVF), and time decay correction (TDC). Fuzzy AHP is used to assign weight to criteria and TOPSIS is used to rank the contractors, PVF and TDC is used to evaluate the performance of previous projects more proportionally. The results show that Price Bid has the biggest weight at 0.362, with Technical Qualifications second at 0.279 and Previous Project Performance third at 0.234. This result shows that price remains a dominant factor in selecting EPC contractors. However, the price is still combined with technical criteria, project execution capability, project experience, and the contractor’s past performance, so the model provides a more balanced evaluation, where cost efficiency is considered without ignoring the risks of project delays, additional work, lower work quality, and failure to achieve the project target. Based on the TOPSIS results, Contractor E (0.8837) is the most suitable contractor for Project XYZ. However, the difference in preference scores should also be considered as an early signal of project risk, particularly for lower-ranked contractors (A, B, C, and D). PT XZ should therefore set a minimum preference score before awarding the contract. This would help ensure that the selected contractor is not only competitive in price, but also strong in technical capability and past performance. The sensitivity analysis confirms that the ranking is stable, making the model useful for transparent and risk-based contractor selection.
References
[1] R. W. Saaty, “The analytic hierarchy process-what it is and how it is used,” Math Model, vol. 9, no. 3–5, pp. 161–176, 1987, doi: 10.1016/0270-0255(87)90473-8.
[2] M. Pangaribuan, N. Handayani, and Yusnawati, “Performance Measurement of Green Supply Chain Management (GSCM) Using the Analytical Hierarchy Process (AHP) Method: Pengukuran Kinerja Manajemen Rantai Pasok Hijau (GSCM) Menggunakan Metode Analytical Hierarchy Process (AHP),” PROZIMA (Productivity, Optim Manuf Syst Eng, vol. 7, no. 2 SE-Articles, pp. 94–109, Jan. 2024, doi: 10.21070/prozima.v7i2.1614.
[3] I. Gunawan, D. Trihastuti, M. E. Sianto, and I. Godelva, “Selecting Shoes Box Suppliers using DEMATEL-ANP-WZOGP Approach: Seleksi Pemasok Kemasan Sepatu dengan Pendekatan DEMATEL-ANP-WZOGP,” PROZIMA (Productivity, Optim Manuf Syst Eng, vol. 6, no. 2 SE-Articles, pp. 72–84, Dec. 2022, doi: 10.21070/prozima.v6i2.1574.
[4] I. Marović, M. Perić, and T. Hanak, “A multi‐criteria decision support concept for selecting the optimal contractor,” Appl Sci, vol. 11, no. 4, pp. 1–18, 2021, doi: 10.3390/app11041660.
[5] L. D. Long, “Integrating the group-based fuzzy best-worst method and fuzzy technique for order of preference by similarity to ideal solution for selecting contractors for heritage building renovation projects,” Eng Appl Artif Intell, vol. 142, no. January, p. 109928, 2025, doi: 10.1016/j.engappai.2024.109928.
[6] S. Karami, S. M. Mousavi, and J. Antucheviciene, “Enhancing Contractor Selection Process by a New Interval-Valued Fuzzy Decision-Making Model Based on SWARA and CoCoSo Methods,” 2023. doi: 10.3390/axioms12080729.
[7] S. K. Gupta, A. Srivastava, and V. Kumar, “Integrating predictive machine learning with transparent decision-making: A LightGBM–TOPSIS approach to supplier selection,” Franklin Open, vol. 15, no. February, p. 100519, 2026, doi: 10.1016/j.fraope.2026.100519.
[8] M. Nazim, C. Wali Mohammad, and M. Sadiq, “A comparison between fuzzy AHP and fuzzy TOPSIS methods to software requirements selection,” Alexandria Eng J, vol. 61, no. 12, pp. 10851–10870, 2022, doi: 10.1016/j.aej.2022.04.005.
[9] L. A. Zadeh, “Fuzzy sets,” Inf Control, vol. 8, no. 3, pp. 338–353, Jun. 1965, doi: 10.1016/S0019-9958(65)90241-X.
[10] A. Tettamanzi and M. Tomassini, Soft Computing : Integrating Evolutionary, Neural, and Fuzzy Systems / A. Tettamanzi, M. Tomassini. 2001. doi: 10.1007/978-3-662-04335-6.
[11] A. E. Karaman and K. Sandal, “Effect of Sub-Contractor Selection on Construction Project Success in Turkey,” Tek Dergi/Technical J Turkish Chamb Civ Eng, vol. 33, no. 4, pp. 12105–12118, 2022, doi: 10.18400/tekderg.731728.
[12] P. Jaskowski, S. Biruk, and R. Bucon, “Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment,” Autom Constr, vol. 19, no. 2, pp. 120–126, Mar. 2010, doi: 10.1016/J.AUTCON.2009.12.014.
[13] H. Deng, “Multicriteria analysis with fuzzy pairwise comparison,” IEEE Int Conf Fuzzy Syst, vol. 2, pp. 215–231, 1999, doi: 10.1109/fuzzy.1999.793038.
[14] B. Oz, “A non-price-based tender evaluation methodology considering tenderers’ self-confidence with partial value functions and time decay analysis,” Expert Syst Appl, vol. 252, no. PA, p. 124186, 2024, doi: 10.1016/j.eswa.2024.124186.
[15] Y. Zhang, S. Tai, and K. Ye, “Contractor Recommendation Model Using Credit Networking and Collaborative Filtering,” Buildings, vol. 12, no. 12, 2022, doi: 10.3390/buildings12122049.
[16] R. R. Menon and V. Ravi, “Using AHP-TOPSIS methodologies in the selection of sustainable suppliers in an electronics supply chain,” Clean Mater, vol. 5, p. 100130, Sep. 2022, doi: 10.1016/J.CLEMA.2022.100130.
[17] I. J. Mulyana and I. Gunawan, “Lean Six Sigma Project Selection to Improve College Business Processes: Pemilihan Proyek Lean Six Sigma untuk Meningkatkan Proses Bisnis Perguruan Tinggi,” PROZIMA (Productivity, Optim Manuf Syst Eng, vol. 8, no. 2 SE-Articles, pp. 97–103, Dec. 2024, doi: 10.21070/prozima.v8i2.1717.
Downloads
Published
How to Cite
License
Copyright (c) 2026 I Nyoman Sudhama Yasa, Suparno Suparno, Ratna Sari Dewi

This work is licensed under a Creative Commons Attribution 4.0 International License.