Proposed Crane Machine Maintenance Schedule with Reliability Centered Maintenance Method
Usulan Jadwal Pemeliharaan Mesin Crane Dengan Metode Reliability Centered Maintenance
Abstract
PT XYZ is a steel smelting company located in Sidoarjo. The company is assisted in the production process by a total of 15 cranes to lift loads that cannot be lifted by bare human hands. Currently the crane machine has the highest downtime of 157 hours compared to other machines. The components that are often damaged are the hover control, braking system, and trolley cable. The purpose of this research is to find out what causes high downtime, know the maintenance schedule, and can improve the reliability of critical components. This research will discuss the maintenance scheduling of crane machine No. 5 using the Reliabilty Centered Maintenance method. The results showed that the cause of high downtime is 3 critical components, namely hover control, braking system, and trolley cable. The proposed maintenance schedule for the 3 critical components has a maintenance time interval of hover control every 250 hours, braking system every 397 hours, trolley cable every 1460 hours, and the machine reliability obtained is 60%. The costs incurred for preventive maintenance amounted to Rp. 382,104,000, this figure increased by Rp. 185,840,000 from the cost of corrective maintenance which initially amounted to Rp. 196,264,000.
References
A. Nurroif and D. Retnowati, “Perencanaan Preventive Maintenance Mesin Crane Dengan Pendekatan Metode Reliability Centered Maintenance (RCM),” Jurnal Teknik Industri (JURTI), vol. 1, no. 2, pp. 111–119, 2022.
I. D. Pranowo, Sistem dan Manajemen Pemeliharaan (Maintenance: System and Management). Sleman: Deepublish, 2019.
D. Teknik Juli, E. Prihastono, and B. Prakoso, “PERAWATAN PREVENTIF UNTUK MEMPERTAHANKAN UTILITAS PERFORMANCE PADA MESIN COOLING TOWER DI CV. ARHU TAPSELINDO BANDUNG.”
E. I. Basri, I. H. Abdul Razak, H. Ab-Samat, and S. Kamaruddin, “Preventive maintenance (PM) planning: a review,” J Qual Maint Eng, vol. 23, no. 2, pp. 114–143, Jan. 2017, doi: 10.1108/JQME-04-2016-0014.
W. Widiasih and N. Aziza, “PERHITUNGAN BIAYA PENGGANTIAN KOMPONEN DENGAN MEMPERTIMBANGKAN PENJADWALAN PERAWATAN PADA MESIN BUCKET RAW MATERIAL,” 2019.
D. Prasetya and I. W. Ardhyani, “PERENCANAAN PEMELIHARAAN MESIN PRODUKSI DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) (Studi Kasus: PT. S),” 2018.
M. K. Rizani, “ANALISIS PREVENTIVE MAINTENANCE MESIN EXTRUSION DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) (Studi Kasus di PT. Lumina Packaging. Sidoarjo, jawa timur),” vol. 4, no. 1, pp. 20–29, 2021.
M. Gustiawan and N. Affandi, “PERENCANAAN ULANG PENJADWALAN PERAWATAN MESIN EXTR UDER MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE DI PT STAEDTER INDONESIA,” Jurnal Ilmiah Teknik dan Manajemen Industri Jurnal Taguchi, vol. 1, no. 2, pp. 134–270, 2021, doi: 10.46306/tgc.v1i2.
M. A. Rosyid and M. Indrayana, “Prosiding Seminar Nasional Teknik Industri (SENASTI).”
I. Ramadhan and W. Widiasih, “Analisis Penggantian Dan Perawatan Bagian Wire Dan Dryer Pada Unit Papermachine Dengan Metode Reliabilty Centered Maintenance (RCM) Pada PT. X,” Universitas 17 Agustus 1945 Surabaya, Surabaya, 2023.
D. Asih, M. Tarno, A. Hoyyi, R. Rahmawati, and Y. Wilandari, Survival Analysis. Semarang: UNDIP Press, 2021.
S. Umam and W. Widiasih, “Penjadwalan Perawatan Mesin Grading Plant II di PT Keramik Diamond Industries Gresik dengan Metode RCM,” 2024.
A. C. Kumala, “PERANCANGAN PENJADWALAN PEMELIHARAAN MESIN PRODUKSI UNTUK MENINGKATKAN KEHANDALAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM),” Universitas Pembangunan Nasional “Veteran” Yogyakarta, Yogyakarta, 2022.
W. E. Syahputro and W. Widiasih, “Usulan Penjadwalan dan Biaya Preventive Maintenance Mesin Line 1 Horizontal Guna Menurunkan Waktu Downtime,” Universitas 17 Agustus 1945 Surabaya, Surabaya, 2024.
Y. E. Priharanto, MANAJEMEN PERAWATAN DAN OPTIMALISASI SISTEM PELUMASAN STATIONARY DIESEL ENGINE PADA PENGGERAK KAPAL IKAN. ARTA MEDIA, 2024. [Online]. Available: https://books.google.co.id/books?id=zOEREQAAQBAJ
M. Burhannudin and M. Anshori, “IMPLEMENTASI RELIABILITY CENTERED MAINTENANCE PADA EXCAVATOR PC-800,” vol. 5, no. 2, pp. 143–150.
Copyright (c) 2024 Dimas Maulana Agta Pratama, Wiwin Widiasih

This work is licensed under a Creative Commons Attribution 4.0 International License.