Determination of Preventive Maintenance Time Intervals on Nail Making Machines Using Reliability Centered Maintenance (RCM) II . Method


Penentuan Interval Waktu Preventive Maintenance Pada Nail Making Machine Dengan Menggunakan Metode Reliability Centered Maintenance (RCM) II


  • (1) * Muhammad Arizki Zainul Ramadhan            Program Studi Teknik Industri, Fakultas Teknik, Universitas Muhammadiyah Sidoarjo  
            Indonesia

  • (2)  Tedjo Sukmono            Program Studi Teknik Industri, Fakultas Teknik, Universitas Muhammadiyah Sidoarjo  
            Indonesia

    (*) Corresponding Author

Abstract

With the increasing needs of productivity and the use of high technology in the form of machines and production facilities, the need for maintenance functions is growing. At PT. Surabaya Wire that produces nails and wires of problems that arise especially related to damage to nail making machine, it causes the hours to stop (downtime) and delay in the production process so that the engine performance becomes less effective. The purpose of the research is to determine the time interval schedule of care and know the action or maintenance activities to be done. To solve the problem in this research using Reliability Centered Maintenance (RCM) II method with Failure Modes and Effect Analyze (FMEA) calculation. RCM II defined a process used to determine what should be done for machine maintenance, whereas for FMEA it is defined as a method to identify the highest failure form on any machine malfunction. From the calculation result using FMEA and RCM II, we got treatment interval result on side shaft component (metal handlebar) with maintenance interval for 63 hours, for crank shaft component (metal road) with maintenance interval for 81 hours, and for Electric motor component with maintenance interval for 374 hours.

References

Bangun, I. H., Rahman, A., & Darmawan, Z. (2014). Perencanaan Pemeliharaan Mesin Produk Dengan Menggunakan Metode RCM II Pada Mesin Blowing Om. Jurnal Teknik Industri, 997-1008.

Dhamayanti, D. S., Alhilman, J., & Athari, N. (2016). Usulan Preventive Maintenance dengan Menggunakan Reliability Centered Maintenance II dan Risk Based Maintenance. Jurnal Rekayasa Sistem dan Industri, 3(2), 31-37.

Putra, B. I. (2010). Evaluasi Manajemen Perawatan dengan Metode Reliability Centered Maintenance II. Teknolojia, 5, 59-66.

Sari, D. P., & Ridho, M. F. (2016). Evaluasi Manajemen Perawatan dengan Metode Reliability Centered Maintenance II Pada Mesin Blowing I di Plant I PT. Pisma Putra Textile. Jurnal Teknik Industri, 6(2), 73-80.

Picture in here are illustration from public domain image (License) or provided by the author, as part of their works
Published
2018-12-31
 
How to Cite
Ramadhan, M. A. Z., & Sukmono, T. (2018). Determination of Preventive Maintenance Time Intervals on Nail Making Machines Using Reliability Centered Maintenance (RCM) II . Method. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 2(2), 49-57. https://doi.org/10.21070/prozima.v2i2.1349
Section
Articles