Minimizing Material Handling Costs with the SLP Method and Material Transport Equipment in Steel Pipe Companies Minimalisasi Biaya Material handling Dengan Metode SLP dan Material Transport Equipment Pada Perusahaan Pipa Baja

Main Article Content

Nur Kalim
Lukmandono

Abstract

Factors that influence the amount of material handling costs are the distance of material movement, methods, and tools (equipment) used. The distance of material movement is strongly influenced by the layout of the production facility. The new layout design using the SLP method is expected to reduce the distance of material or product movement in PT. A B C. From the analysis results obtained the total distance of material transfer at the initial layout of the production process at PT. ABC of 1761 meters / month with material handling costs of Rp. 315,390,000.00 / month. Then an analysis of the use of material transport equipment results in the replacement of a crane with a sloping plane to connect the production machine. So the cost of material handling using the inclined plane becomes Rp. 0. The use of sloping fields can only be used on certain production machines. By using the Systematic Layout Planning (SLP) method, there are 3 alternative layouts produced. The most optimal alternative layout is alternative layout 3 with monthly material handling cost savings of Rp. 68,100,000.00 or 21% of the initial material handling layout cost.

Article Details

How to Cite
Kalim, N., & Lukmandono. (2021). Minimizing Material Handling Costs with the SLP Method and Material Transport Equipment in Steel Pipe Companies. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 4(2), 10-16. https://doi.org/10.21070/prozima.v4i2.1310
Section
Articles

References

[1] Murnawan, H., Eka, P. and Karunia, D. (2018) ‘Perancangan Ulang Fasilitas Dan Ruang Produksi Untuk Meningkatkan Output Produksi’, Jurnal Teknik Industri, 19(2), pp. 157–165.
[2] Susetyo, J. dkk (2010) ‘Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Pendekatan Group Technology Dan Algoritma Blocplan Untuk Meminimasi Ongkos Material handling’, Jurnal Teknologi, 3(Juni), pp. 75–83.
[3] Sofyan, M. S. and Cahyana, A. S. (2017) ‘Relayout Gudang Barang Jadi Untuk Memaksimalkan Kapasitas Produk Jadi Dengan Menggunakan Metode Activity Relation Chart dan Shared Storage’, Spektrum Industri, 15(2), pp. 185–197.
[4] Susetyo, J. dkk (2010) ‘Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Pendekatan Group Technology Dan Algoritma Blocplan Untuk Meminimasi Ongkos Material handling’, Jurnal Teknologi, 3(Juni), pp. 75–83.
[5] Rosyidi, M. R. (2018) ‘Analisa tata letak fasilitas produksi dengan metode arc, ard, dan aad di PT. ABC’, Jurnal Teknik Waktu, 16(1), pp. 82–95.
[6] Rahman, F. Tarigan, Z J H. dan Lukmandono (2018) ‘Disain Relayout Warehouse Dengan Pendekatan SLP (Systematic Layout Planning) dan Class Based Storage Untuk Meminimumkan Biaya Material Handling’, Seminar Nasional Sains dan Teknologi Terapan V 2018: Institut Teknologi Adhi Tama Surabaya.
[7] Mubarok, H dan Lukmandono (2017) ‘ Perancangan Ulang Tata Letak Fasilitas Dengan Pendekatan Metode Systematic Layout Planning Guna Meningkatkan Produktivitas di CV. Putra Perkasa’, Seminar Nasional Sains dan Teknologi Terapan V 2017: Institut Teknologi Adhi Tama Surabaya. ISBN 978-602-98569-1-0
[8] Kay, M. G. (2012) Material handling Equipment. Raleigh: North Carolina State University.