Pengendalian Persediaan Bahan Baku Oli Untuk Mesin Diesel Tipe G4J-801, G5J-801 dan G7J-801 di PT. Hansan Asembling – Malang


Inventory Control of Oil Raw Materials For Diesel Engine Types G4J-801, G5J-801 and G7J-801 at PT. Hansan Assembling – Malang


  • (1) * Rony Prabowo            Institut Teknologi Adhi Tama Surabaya  
            Indonesia

    (*) Corresponding Author

Abstract

Inventories of raw materials is one of the most important elements in the company's operations are continuously must be obtained, processed and resold. The raw material is meant for the smooth running of production operations set. So, we need an optimum inventory levels to meet the needs of both the quantity, quality and time at a low cost. For that we need a system of planning and inventory control are best - well, that inventories of raw materials should be defined and calculated correctly and accurately in order to obtain a low total cost of inventory that can minimize the cost of production. Forecasting approach is expected to represent the number of actual demand in the coming period. Based on the number of requests of forecasting results can be determined raw material inventory control. By using EOQ then firms will be able to minimize the cost of raw material supplies of oil. Companies should pay attention to the order of recording historical data of oil, classification of costs - the cost of orders and storage costs, because such data is necessary to obtain optimal results inventory control.

References

Basheka, B. C. 2008. Procurement Planning and Local Governance in Uganda: A Factor Analysis Approach. Paper Presented at the 2008 International Research Society for Public Management Conference, from 26-28 March 2008, in Brisbarne, Australia

Venable, G.M., Rose, V.D., Bush, A., Gilbert, F.W. 2015. The role of brand personality in charitable giving: an assessment and validation. Journal of the Academy of Marketing Science, Vol. 33 pp.295-312

Spyros Makridakus, et al. 2000. Metode dan Aplikasi Peramalan. Edisi Ketiga. Penerbit Erlangga. Jakarta

Depnaker. 2010. Peraturan Upah Tenaga Kerja. Surabaya

Kumar, U., Huang, Y. 2013. Reliability analysis of a mine production system – a case study. Proceedings of the Annual Reliability and Maintainability Symposium, pp.167-72

Makidarkis, Spyros, et al. 2001. Metode Aplikasi Peramalan. Edisi Kedua. Erlangga. Jakarta

Arman Hakim Nasution, 2003. Perencanaan dan Pengendalian Persediaan. Teknik Industri. ITS

Sutaksana. Z, Anggawisarta. R. Tjakraatmadja, J.H, 1997. Teknik Tata Cara Kerja. Departemen Teknik Industri ITB. Bandung

Eugene L. Grant, W. Grant Iresm, Ricard S. Leovenworth. 2002. Dasar-Dasar Ekonomi Teknik. Jilid 1. Aneka Cipta. Jakarta

Buffa, E.S. 2001. Manajemen Produksi atau Operasi, Jilid 1. Erlangga, Jakarta. Pittsburg

Charles, O.E. 2012. Gantt charting multiple machines' preventive maintenance activities. Nigerian Journal of Engineering Research and Development, Vol. 1 No.1, pp.60-7

Biegel, John. E, 2002. Pengendalian Produksi- Suatu Pendekatan Kuanitatif. Akademi Pressindo. Jakarta

Sriskandarajah, C., Jardine, A.K.S., Chan, C.K. 2008. Maintenance scheduling of rolling stocks using a genetic algorithm. Journal of Operational Research Society (UK), Vol. 49 pp.1130-45

Wignjosoebroto, Sritomo. 1992. Teknik Tata Cara Kerja dan Pengukuran Kerja. Edisi Kedua. Guna Widya Surabaya

Agaba, E and Shipman, N. 2007. Public Procurement Reform in Developing Countries: The Ugandan Experience. Journal of Advancing Public Procurement: Practices, Innovation and Knowledge-Sharing (pp. 373-391). Boca Raton, FL

Assauri Sofyan. 2004. Teknik dan Metode Peramalan. Edisi Keempat. Lembaga Penerbit Fakultas Ekonomi Universitas Indonesia. Jakarta

Picture in here are illustration from public domain image (License) or provided by the author, as part of their works
Published
2017-06-30
 
How to Cite
Prabowo, R. (2017). Pengendalian Persediaan Bahan Baku Oli Untuk Mesin Diesel Tipe G4J-801, G5J-801 dan G7J-801 di PT. Hansan Asembling – Malang. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 1(1), 33-43. https://doi.org/10.21070/prozima.v1i1.704
Section
Articles