1.
Fadli MR, Sulistiyowati W. Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur): Optimalisasi Penjadwalan Produksi Pipa Di Line 18 Dengan Metode First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) (Studi Kasus : Pt Wtur). prozima [Internet]. 2021 Mar. 9 [cited 2025 Oct. 22];3(2):44-5. Available from: https://prozima.umsida.ac.id/index.php/prozima/article/view/1268