Fadli, M. R., and W. Sulistiyowati. “Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur)”. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), Vol. 3, no. 2, Mar. 2021, pp. 44-54, doi:10.21070/prozima.v3i2.1268.