Ramadhan, Muhammad Arizki Zainul, and Tedjo Sukmono. “Determination of Preventive Maintenance Time Intervals on Nail Making Machines Using Reliability Centered Maintenance (RCM) II . Method: Penentuan Interval Waktu Preventive Maintenance Pada Nail Making Machine Dengan Menggunakan Metode Reliability Centered Maintenance (RCM) II”. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), vol. 2, no. 2, Dec. 2018, pp. 49-57, doi:10.21070/prozima.v2i2.1349.