“EPC Contractor Selection Using Fuzzy AHP, TOPSIS, Partial Value Function, and Time Decay Correction Methods”. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), vol. 10, no. 1, June 2026, pp. 51-60, https://doi.org/10.21070/prozima.v10i1.1786.