[1]
“Analysis of Bolt Former Machine Effectiveness Using Overall Equipment Effectiveness (OEE) and Six Big Lossess: Analisis Efektivitas Mesin Bolt Former Menggunakan Overall Equipment Effectiveness (OEE) dan Six Big Losses”, prozima, vol. 8, no. 1, pp. 25–34, June 2024, doi: 10.21070/prozima.v8i1.1688.