Fadli, M. R. and Sulistiyowati, W. (2021) “Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur)”, PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 3(2), pp. 44-54. doi: 10.21070/prozima.v3i2.1268.