Fadli, M. R. and Sulistiyowati, W. . (2021) “Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur): Optimalisasi Penjadwalan Produksi Pipa Di Line 18 Dengan Metode First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) (Studi Kasus : Pt Wtur)”, PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 3(2), pp. 44–54. doi: 10.21070/prozima.v3i2.1268.