Yasa, I. N. S., Suparno, S. and Dewi, R. S. (2026) “EPC Contractor Selection Using Fuzzy AHP, TOPSIS, Partial Value Function, and Time Decay Correction Methods”, PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 10(1), pp. 51–60. doi: 10.21070/prozima.v10i1.1786.