“EPC Contractor Selection Using Fuzzy AHP, TOPSIS, Partial Value Function, and Time Decay Correction Methods” (2026) PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 10(1), pp. 51–60. doi:10.21070/prozima.v10i1.1786.