Fadli, Mohamad Rizal, and Wiwik Sulistiyowati. 2021. “Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur)”. PROZIMA (Productivity, Optimization and Manufacturing System Engineering) 3 (2), 44-54. https://doi.org/10.21070/prozima.v3i2.1268.