BUCHORI, M.; SUKMONO, T. Production Forecasting Using Autoregressive Integrated Moving Average (ARIMA) Method at PT. XYZ.
PROZIMA (Productivity, Optimization and Manufacturing System Engineering)
, v. 2, n. 1, p. 27-33, 30 Jun. 2018.