WARDHANA, Rahardi; LUKMANDONO. Design Cost Control in Risk Management with the Expected Money Value (Emv) and Hirarc Method at Pt Xyz Jawa Timur Surabaya: Desain Cost Control Pada Risk Management Dengan Metode Expected Money Value (Emv) Dan Hirarc Di Pt Xyz Jawa Timur Surabaya. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), [S. l.], v. 4, n. 1, p. 12–22, 2021. DOI: 10.21070/prozima.v4i1.1276. Disponível em: https://prozima.umsida.ac.id/index.php/prozima/article/view/1276. Acesso em: 3 sep. 2025.