FADLI, Mohamad Rizal; SULISTIYOWATI, Wiwik. Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur): Optimalisasi Penjadwalan Produksi Pipa Di Line 18 Dengan Metode First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) (Studi Kasus : Pt Wtur). PROZIMA (Productivity, Optimization and Manufacturing System Engineering), [S. l.], v. 3, n. 2, p. 44–54, 2021. DOI: 10.21070/prozima.v3i2.1268. Disponível em: https://prozima.umsida.ac.id/index.php/prozima/article/view/1268. Acesso em: 22 oct. 2025.