Fadli, M. R., & Sulistiyowati, W. (2021). Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur). PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 3(2), 44-54. https://doi.org/10.21070/prozima.v3i2.1268