EPC Contractor Selection Using Fuzzy AHP, TOPSIS, Partial Value Function, and Time Decay Correction Methods. (2026). PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 10(1), 51-60. https://doi.org/10.21070/prozima.v10i1.1786