(1)
Analysis of Bolt Former Machine Effectiveness Using Overall Equipment Effectiveness (OEE) and Six Big Lossess: Analisis Efektivitas Mesin Bolt Former Menggunakan Overall Equipment Effectiveness (OEE) Dan Six Big Losses. prozima 2024, 8 (1), 25-34. https://doi.org/10.21070/prozima.v8i1.1688.