[1]
Utama, D.M. 2018. LPT-Branch and Bound Algorithm in Flexible Flowshop Scheduling to Minimize Makespan. PROZIMA (Productivity, Optimization and Manufacturing System Engineering). 2, 1 (Jun. 2018), 20-26. DOI:https://doi.org/10.21070/prozima.v2i1.1527.