[1]
Hidayat, R.E. and Putra, B.I. 2021. Re-Layout Layout of Material Warehouse Using Dedicated Storage Method at PT. A B C. PROZIMA (Productivity, Optimization and Manufacturing System Engineering). 3, 2 (Mar. 2021), 55-61. DOI:https://doi.org/10.21070/prozima.v3i2.1270.