[1]
2026. EPC Contractor Selection Using Fuzzy AHP, TOPSIS, Partial Value Function, and Time Decay Correction Methods. PROZIMA (Productivity, Optimization and Manufacturing System Engineering). 10, 1 (June 2026), 51–60. DOI:https://doi.org/10.21070/prozima.v10i1.1786.