[1]
2024. Analysis of Bolt Former Machine Effectiveness Using Overall Equipment Effectiveness (OEE) and Six Big Lossess: Analisis Efektivitas Mesin Bolt Former Menggunakan Overall Equipment Effectiveness (OEE) dan Six Big Losses. PROZIMA (Productivity, Optimization and Manufacturing System Engineering). 8, 1 (June 2024), 25–34. DOI:https://doi.org/10.21070/prozima.v8i1.1688.